How to fill out an AS9102 First Article Inspection Report with Excel
As9102 Form 3. Characteristic accountability, verification and compatibility evaluation shall be used to record an actual measurement or inspection/verification of the fai part for every design characteristic on the drawing, including notes. Web delta fai design change significant change in the method of manufacture e.g.
How to fill out an AS9102 First Article Inspection Report with Excel
Web our downloadable as9102 rev. Please download our free as9102 first article inspection forms (as9102 rev. Web in the aerospace and defense industry, the as9102 first article inspection is the standard. Part number accountability o as9102 form 2: Web o as9102 form 1: Web an as9102 fair, or first article inspection report, certifies that each sample was produced and inspected according to the customer's specifications. If you don’t have this form, you can download it by clicking on the link below. Part number accountability, product accountability, and characteristic accountability. This article is a detailed example of how to fill out all 3 forms of the as9102 first article inspection report. Tooling, processes, location, machine, numerical control program, sequence of manufacture fai submission requirements each fai must include the following:
Get form as9102 and then click get form to get started. Web o as9102 form 1: Characteristic accountability, verification and compatibility evaluation shall be used to record an actual measurement or inspection/verification of the fai part for every design characteristic on the drawing, including notes. As9102 first articles used by the aerospace and defense industries include 3 forms: B forms are excel file format with unlocked sheets and cells. Web form 3 characteristic accountability, verification, and compatibility evaluation additional documentation must also be supplied when referenced in the fair, such as balloon drawings, certificates of conformance, material certificates, special. Web delta fai design change significant change in the method of manufacture e.g. Characteristic accountability, verification and compatibility evaluation important: The instructions listed in this document refers to the current revision of this form (rev b). Get form as9102 and then click get form to get started. If you don’t have this form, you can download it by clicking on the link below.