Certificate Of Substantial Completion Form. Web download or preview 2 pages of pdf version of certificate of substantial completion (doc: Completed march thru april 2005 author:
Certificate Of Substantial Completion Template
Contractor's leed submittals and reports. A certificate of occupancy is issued by a local building inspector, and establishes that. Web substantial completion checklist verified action: Office of facilities planning, school district, architect or engineer. All systems functioning as designed 4. Web certified by owner’s representative: Completed march thru april 2005 author: Web substantial completion is the stage in the progress of the work when the work or designated portion is sufficiently complete in accordance with the contract documents so that the owner can occupy or utilize the work for its intended use. Sample 1 sample 2 sample 3. Web the work to which this certificate applies has been inspected by authorized representatives of the owner, contractor and engineer, and found to be substantially complete and is also the date of commencement of applicable warranties required by the contract documents, * (except as attached.)
Sample 1 sample 2 sample 3. (authorized representative printed name) accepted by using agency (authorized representative signature) (date signed)(using agency authorized representative signature) (date signed) (authorized representative printed name) cap form g704 (04/2020) (using agency authorized representative. Sample 1 sample 2 sample 3. All utilities and meters connected, tested and operational 6. A certificate of occupancy is issued by a local building inspector, and establishes that. Web substantial completion is the stage in the progress of the work when the work or designated portion is sufficiently complete in accordance with the contract documents so that the owner can occupy or utilize the work for its intended use. All fas, cops, and change orders submitted 3. Web substantial completion checklist verified action: Office of facilities planning, school district, architect or engineer. Certificate of substantial completion means the certificate executed by the a/e, odr and contractor that documents to the best of a/e’s and odr’s knowledge and understanding, contractor’s sufficient completion of the work in accordance with the contract, so as to be operational and fit for the use intended. Completed march thru april 2005 author: